SUSE Linux Documentation
Start-Up Guide
/ Part II. Installation on IBM POWER
2.3. Controlling Installation Remotely
Chapter 3. Installation Considerations
Part II. Installation on IBM POWER
Contents
3. Installation Considerations
3.1. Types of Installation
3.2. IPL Options
3.3. Installation Source
3.4. Installation Targets
3.5. Connecting to the Installation System
4. Installation Procedure
4.1. Installing in an Entire System
4.2. Installing in an LPAR